Sign In | Join Free | My hardware-wholesale.com
China Kaiping Zhonghe Machinery Manufacturing Co., Ltd logo
Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Honesty is the foundation of harmony, quality is the way of survival, the market is the source of harmony benefits, innovation is the soul of harmony development, the brand is the god of the growth of
Verified Supplier

3 Years

Home > Excavator Pile Driving >

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Kaiping Zhonghe Machinery Manufacturing Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Brand Name : Zhonghe

Model Number : DZB005

Certification : CE

Place of Origin : Guangdong, China

MOQ : 1 piece

Price : $6300-$3400/pieces

Payment Terms : T/T

Supply Ability : 60 Piece/Pieces per Month

Delivery Time : 15-20 work day

Packaging Details : wood case

Suitable Excavator(ton) : 20-85T

Product name : excavator pile driving boom

Marketing Type : New Product 2022

After-sales service provided : Online support

Color : Yellow/Gray/Red/Green/Customizable

Material : Q355B Q690D

Application : Excavator Attachment

Condition : 100%New

Applicable industries : Construction works,Machinery Repair Shops,Energy & Mining,Building Material Shops

Weight : 2700-9000KGS

Packing : Bubble bag packaging

Capacity : 0.6-2.5 cbm

MOQ : 1 PCS

Contact Now

Pile Driver Attachment For Excavators

2024 Zhonghe Machinery Catalogue 3M.pdf

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Product Description-----Excavator Pile driving Boom Arm

What is an excavator piling arm?

An excavator piling arm is a specific configuration of excavator arm equipped or modified for piling.

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

What are your advantages?

Advantages of excavator piling arm:

1. Increase the thickness of the upper and lower plates of the boom and adopt double reinforcement inside. The stress points of arm lugs are treated with segmented thickened plate, which improves the overall service life of piling arm.

2. The opening angle between piling arm and arm can be up to 160 degrees, and the opening angle between piling arm and base can be up to 88 degrees, which improves the overall drilling and pulling force and working efficiency.

3. The piling arm is welded and then drilled, the precision is as high as the original piling arm, which prolongs the service life.

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Some common size references

Excavator
(ton)
Total Length
(mm)
Boom
(mm)
Arm(mm)

Pilling Height

(mm)

Counterweight
(ton)
30-36 13800 10000 3800 15400 3T
30-36 15000 10500 4500 17100 5T
40-45 15800 11000 4800 17900 3T
40-45 16800 11500 5300 18500 5T-6T
45-50 19000 12500 6500 21000 6T-7T

Product Detail Display

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
Telescopic Boom Arm Engineering Case
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

About Hydraulic Vibratory Pile Driving Hammer

1. Part of engineering applications:

Municipal sewage pipeline laying, land reclamation, bridge cofferdam, building foundation, high-speed railway foundation treatment, highway soft foundation treatment, wharf engineering, deep foundation pit support, etc.


2. Hydraulic vibratory hammer consists of four main components:
Boom assembly, frame assembly, housing assembly and fixture assembly.
It is mainly used for piling, such as driving reinforced concrete piles and steel sheet U-piles into the ground to reinforce the foundation, and then supporting the structure or fixing the building.

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
Related Product Recommendation
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
excavator long reach boom sliding boom/telescopic boom
20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer
two-section telescopic boom two-section demolition boom

About Our Company------Zhonghe Machinery

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

CE certification & Utility model patent certificates

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Shipping And Packaging

Our products have been sold to more than 60 countries and are shipped by sea, land and air. Our packaging is in wooden crates or stretch film packaging. Goods are packed before shipment and then loaded into containers to ensure the safety of the goods.

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer

Some questions and answers that may interest you

Q: Are you a manufacturer?

A: We are a manufacturer/supplier of excavator arms and attachments. We have a super-large factory which covers an area several times larger than our competitors. We are the largest manufacturer of excavator accessories in Guangdong Province with full production facilities and export our products to more than 60 countries around the world.

Q: What is the material of the piling arm?

A: We generally use Q355B material. If the customers have higher requirements on the material, we can use Q690D material or other high strength materials.

Q: How to allocate the arm frame and arm length of the piling arm more reasonably?

A: The length of the boom minus the length of the arm is equal to 5.5 meters, not less than this length. When the jib and boom are folded for transportation, the vibrating hammer will hit the excavator and the transportation height is too high.

Q: What are the design requirements of the piling arm?

A: The opening angle between the movable arm and the bucket of our piling arm is basically 160°, and the angle between the movable arm and the horizontal plane can be up to 88°.

If you want to learn more details, just contact Ada

Whatsapp: +86 15322105263

Teil/Wechat: 0086 15322105263

E-mail: abby@excavatorboomarm.com


Product Tags:

Long Boom Excavator Arm

      

Pile Driver Excavator Arm

      

20-85T Excavator Arm

      
China 20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer wholesale

20-85T Excavator Pile Driver Arm Long Boom With Pile Driver Hammer Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Kaiping Zhonghe Machinery Manufacturing Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)